|
Your Position: Home
> Products
> Heavy-duty Anti-corrosion Modified Epoxy
Powder Coating |
|
A.General introduction of the Products
Pipeline conveying is a most effective conveying method of such medium
as water,gas and petrolium, The reliability of pipenlines depends,to
the great extend,on the anti-corrosion of the steel pipelines.The
life of the pipelines may extend decades by adopting a fine cotaing
method.ZHENG YUAN heavy-duty powder coatings is a ideal anti-corrosion
material of easy coatings and rapid curing.The products of EPY2
series (I-IV)is suitable for the coatings of single layer coatings
pipelines and compound coating pipelines for oil and gas;oil-field
drill pipes,water-flooding pipes,city water-pipes,sewage pipelines,reinforcing
bars and auto engine parts. EPY2-I heavy duty anti-corrosion
powder coating has the following good specific properties:
A. The coatings can resist chemical corrosion by
such organic matters in the conveyed medium as H2S,CO2,O2,acid,alkali,and
salt,and can resist corrsion by underground salty water,sea water
and various organic acid produced by microorganism in the soil.
B. The coating is tough and wear-resisting;and can
resist mechanical damage in construction and stress damage by plant
roots and the soil,with its fine impact resistance and bending resistance. C. The coating,with pretty high insulation
resistance,can resist chemical corrosion under the cathode pretection
so as to achieve the result to safeguard the coated for a long period
of time.
D. The coating has good high temperature resistance
and low temperature resistance with the range between -30oC
and 90oC,EPY2-III powder coatings can be used
at the temperature as high as 160oC. E.
The powder coating is suitable for high efficient assembly line with
its simply working process and rapid curing and the workpiece doesn't
need priming paint. F. The coating quality is
easy to control and the pipe surface easy to be checked and repaired.
II Varieties and Properties:
ZHENG YUAN heavy duty modified epoxy powder coatings can be divided
into EPY2-I. EPY2-II.
EPY2-III and EPY2-IV,according
to the curing time and the applying specific properties.Each has its
own advantages and applying fields.
| Items
Varieties Index |
EPY2-I |
EPY2-II |
EPY2-III |
EPY2-IV |
| GellingTime |
180oC |
100~150 |
23~25 |
35~45 |
30~35 |
| 205oC |
70~90 |
17~19 |
25~30 |
23~28 |
230oC |
40~50 |
5~10 |
15~18 |
14~16 |
Curing
Time
(min) |
180oC |
10~15 |
4 |
8 |
6 |
205oC |
8~10 |
2 |
4 |
2.5 |
230oC |
5~7 |
1 |
2 |
1 |
|
Applying Scope
|
Pipe inside spraying coating auto engine
and flange,elbow,valve etc.special shaped parts. |
Pipe outside coating,spirial reinforcing
bar,long distance pipelines burried underground |
Pipe inside and outside coating auto engines
and special shaped parts |
Three-layer structure anticorrosion prmer
or pipe outside spraying coating |
| Distinguishing
features |
1. Slow curing
2. Good flow
3. Good heat resistance
4. Fine gasoline resistance
5. Nonpoisonous to be used on water pipes.
6. Baked at later stage |
1. Rapid reaction and curing speed with extra heat
2. Good mechanical
3. Huminity resistance used in the range of -40~90oC
4. High working efficency |
1. Mid-curing speed
2. Low melting viscosity to get even smooth film surface
3. Good high temperature resistance to be used on the drilling
pipes in oil fields
4. Give consideration of flow and curing speed
5 Not so good storage |
1. High activation at high temperature
2. Good adhesion on steel
3. Long gelling time to be good to mid gelling layer melting
4. Good affinity with copolymers of ethylene and vinyle acetate |
|
Powder Indes for Heavy -duty Anti corrosion
Powder coatings
|
No. |
Items |
Unit |
Test
method |
EPY2-I |
EPY2-II |
EPY2-III |
EPY2-IV |
1 |
Size |
um |
GB6554 |
<150um average size40~50um |
2 |
Density |
g/cm3 |
GB4472-86 |
1.3~15 |
3 |
Nonvolatile
content |
% |
GB6554-8 |
>99.5 |
4 |
Curing curve |
___ |
Q/GD0151.2-93 |
____ |
5 |
Magnetic
content |
% |
GB2482-83 |
<0.002 |
The Coating Property
|
No. |
Items |
Unit |
Standard |
Index |
|
EPY2-I |
EPY2-II |
EPY2-III |
EPY2-IV |
1 |
Adhesion |
Grade |
Q/GD0151.5-93 |
1 |
1 |
1 |
1 |
2 |
Bending
Resistance |
Grade |
Q/GD0151.6-93 |
1 |
1 |
1 |
___ |
3 |
Impact
Resistance |
J |
Q/GD0151.7-93 |
20 |
23.4 |
20 |
___ |
4 |
Wearing
Resistance |
L/um |
Q/GD0151.8-93 |
 3.0 |
 3.0 |
 3.0 |
___ |
5 |
Insulation
Resistance |
 .m 2 |
Q/GD0151.9-93 |
>1*108 |
___ |
| 6 |
Cathodic
Disbonding
48h,65oC |
mm |
Q/GD0151.10-93 |
 8
Film thickness350  50um
|
<8
60-80um |
7 |
10%HCL
Solution Immersing
|
90Days |
Q/GD0151.11-93 |
The coating having no change |
___ |
8 |
10%NaCL
+H2SO4
PH=3 |
90Days |
Q/GD0151.11-93 |
The coating having no change |
___ |
9 |
10%NaCL |
90Days |
Q/GD0151.11-93 |
Ditto |
___ |
10 |
5%NaOH |
90Days |
Q/GD0151.11-93 |
Ditto |
___ |
11 |
Distilled
Water
Immersion |
90Days |
Q/GD0151.11-93 |
Ditto |
___ |
|
III.Working Method:
A.Woking Process:
Electrostatic spraying or direct scatter homogeneously on the preheated
pipe walls pretreated by cleaning rust of greasy dirt or sand blasting;and
then melting,curing,interlinking and flowing at the given temperature
so as to form homogeneous,and fine coating film fast adhesive to the
walls.
Single Layer Coating Process:
Storage outside pipes High
temperature burning Pills(or sand blasting) Preheating
pipes Coating Cooling Testing Repairing and mending Finished products
Compound structure coating is much similar to single layer coating
in technology requirements with some defferences in coating stage,The
coating process is as follows:
Storage outside pipes High
temperature burning Pills
or sand blasting Preheating
pipes Coating
Sided
to bind gum tape Sided
to bind polyethylene Cooling Tesing Finished
products
B.Working Proccess Instructions:
1. High temperature burning means to burn the pipe
surface with blowlamp so as to eliminate for eigh things or greasy
dirts,and to loosen rust in order to get rid of it easily
2. Sandblasting(or pillblasting) aims at improving
adhesion between workpieces and coatings. The anchor lines produced
by sand blasting must be 30~75um at depth.The workpiece must be cleared
before coated.
3. According to the specific working conditions,intermediate
frequency induction heating,oil-burningheating,or air heating can
be adopted.The heating tempereture can be 200~250oC,in
general,depending on the coating thickness,pipe wall thickness and/or
ambient temperature.To avoid metal oxidation,the pipes mustn't be preteated
at more than 260oC.
4. The single layer anti-corrosion epoxy coating
thickness is better at 350 50um,with
single spraying to reach the required thickness.Repeated spraying
on the same length of the pipe must be forbidden to avoid unuiformness
within the coatings,and affecting flow and anti-corrosion.
5. As EPY2-I,if preheating can't achieve
complete curing,later-stage baking must be adopted.As for EPY2-II
and EPY2-III,consideration must be taken
to later stage baking so as to achieve complitely curing,according
to the thickness of the pipe walls.
6. As for EPY2-IV,three-layer anti-corrosion
coating thickness is better at 60-80um.At the powder gelling process,adhesive
is painted on the coatings to make the epoxy coating and adhesive
melt and cure into a whole on the interface.And lastly polyethylene
tape is slantly binded on the pipes to fast combing with gum coating
by hard rolling.
7. Electric spark leak test must be made after curing,with
the testing voltage of 5v/um,Single layer coating voltage mustn't
be less than 2000v,and three-layer anti corrosion structure mustn't be
smaller than 25 kilovolt.
C.The Film Joint and Leakage Mending:
The welded part of the pipes joint can be mended with various methods
after pill blasting proccess,eg.the two pqrts epoxy system without
solvent,the adhesive tape of PE type,or the heat-contracting cover(not
used in the high-temperture area)and powder coating has been adopted
widly,even mending the broad bore pipe inside wall too,robot move along
the pipe,blasting automaticly and spraying powder,the powder gets
completely cured,relying on the induction heating to make the pipe
inside and outside mending completed at the same time.The film joints
of the three layer anti-corrosion structure are generally are installed
with the heat-contracting cover or PE type radiating intertlinkage.
When the leakage is found out by the electric spark review,it should
be mended in time.The single layer leakage mending of the fusibility
epoxy powder coating can be achieved by two parts liquid epoxy system
without solvent.The finished product pipes must be tested according
to the qulity control standard beforeit can be put into use.
|
|
|
Heavy-duty Anti-corrosion
Modified Epoxy Powder Coating |
|
|